Correct use method of cone crusher

Time:2021-05-17  Writer:ZhongXin
       The cone crusher can start feeding after 1-2 minutes of running at no load. Cone crusher is a relatively widely used stone crushing equipment. In the crushing production, we often find that the crushing effect is not * due to improper operation. In order to ensure the normal operation of the machine, some precautions for the cone crusher are introduced below.
cone crusher
   1. After starting the oil pump motor for 5-10 minutes, check the working condition of the lubrication system. The main motor can be started after the main motor is working normally.
   2. Before starting, please check the lubrication system, cone, correct belt tension, and tighten all screws.
  3. When s ping normally, the ore supply should be s ped *, and in all cases, the main motor can s removing the ore in the crusher. Then s the oil pump motor.
   After s ping, check all parts ly and deal with all problems in time.
  4. The cone crusher can start feeding after 1-2 minutes of no-load operation.
  Because the cone crusher is full of ore, it is necessary to pay attention to whether the ore is normal, especially the ore with a lot of mud and high moisture, to prevent the ore from blocking the feed inlet.
   Also pay attention to check the discharge situation during the operation, and it is not allowed to accumulate ore in the space below the sealing device.