Routine equipment maintenance can start from the following aspects:
Equipment inspection
① When the new equipment is put into operation, the operator on duty conduct a inspection of the machine before starting it. Including the tightening of motors, fixed parts, belt drives, bearing seals, and electrical switches.
②The main parts of the machine, such as blow bars, counterattack liners, and liners, be inspected weekly for wear. If parts are found to be severely worn during the inspection, they should be replaced in time.
③Check the bolts and anchor bolts at various parts every day to see if they are loose or damaged, and tighten or replace them in time.
④ Inspect each part of the joints and welds every week for cracks and breaks. If they occur, they be re-welded to ensure safe production.
In order not to affect the operation of the impact crusher, the impact crusher be inspected on time when working. And the desired amount of crushing is to meet the customer's expected requirements, in addition to timely inspections, but also regular maintenance, such as lubrication and overhaul.