Precautions for the installation of jaw crusher

Time:2022-03-01  Writer:ZhongXin
Due to the large vibration amplitude of the jaw crusher during operation, the equipment should be installed on the concrete foundation. Between the crusher and the concrete foundation, pad wood, rubber and some other shock-absorbing materials to reduce the vibration amplitude and noise. And the impact on the foundation of surrounding buildings.
A layer of metal plate should be laid on the foundation ore discharge trough, and the angle should be inclined (the specific angle depends on the actual situation, not less than 50°), so that the broken stone can be discharged normally, so as not to affect the wear of the jaw head and affect the operation of the jaw crusher. service life.
jaw crusher
The size of the discharge opening should be adjusted according to the particle size of the required product, and then the tension of the spring should be adjusted appropriately to eliminate the noise between the toggle plate and the toggle plate pad, and prevent the toggle plate pad from falling off.
The jaw plate should be made of wear-resistant materials. If the jaw plate is found to be broken during use, the machine should be s ped immediately to prevent the jaw plate fragments from entering the crushing cavity and damaging the machine.